Skip to main content

Tag: Bathroom Refresh

Master Bathroom Renovation: DEMO!

Hi All!

Last I left you, I mentioned we were about to undergo a major renovation of the master bathroom. It was a space that got a DIY makeover a few years back, but with wear + tear it was time for an overhaul.

As much as I adore color, I could only image this new bathroom to be soft + serene and clean + calm. The overall aesthetic will be based more on texture rather than color. Plus layers will add an important element to give the overall space contract + depth.

Just to share a reminder of the ‘before’ space…

Master Bathroom 'BEFORE' the renovation, JENNA BURGER DESIGN

The morning of demo day, I snapped the picture above of the bathroom, and in no time the contractors got to work…

Demo Day for the Master Bathroom renovation, JENNA BURGER DESIGN

From the tub to the vanity to the toilet, everything was ripped out!

As I mentioned in my last post, this renovation is a dual endeavour.  Due lack of time + components outside our skill set, we are taking on some areas of the renovation, while other areas will be performed by a contractor.  As I previously said, I don’t want to be without a bathroom for months AND I want to stay sane (somewhat).

The contractors are tackling the major areas including demo + installing the main components – shower pan + fittings, toilet, vanity + faucet.

DAY ONE

On the first day, the three-man crew removed the existing pre-fab tub, the sheetrock above the tub, the toilet, and the vanity.  It’s a small space, but by lunch time, the space was cleared out…

Instead of installing a new tub, we decided to use the 30″ x 60″ outcove for a shower.  After the tub + sheetrock was removed, the space was ready for the new shower pan.  For the new tile to adhere to, hardiboard (also known as cement board or backerboard) was installed.

Sheetrock is still a great product for the walls and ceiling of a bathroom, just not in the tub/shower area. Cement board is made with actual cement + a firberglass mesh exterior, so it’s waterproof and won’t deteriorate over time when/if it comes in contact with water.

Additionally, the new vanity that I chose is 48″ whereas the existing is 36″… I’m gaining 12″ of counterspace – I’m over the moon! Because of this change, the electrical wiring for the light needs to be moved so it will be centered on the new 48″ space.

By days end, this was the result…

Demo Day for the Master Bathroom renovation, JENNA BURGER DESIGN

Demo Day for the Master Bathroom renovation, JENNA BURGER DESIGN

Check out the purple wall color that was behind the toilet…  it was from before we renovated the last bathroom…  Gosh that color is ghastly and I was hoping to never see it again, ha.

DAY TWO

On the second day of renovation, the new shower pan was installed and the remainder of the space got prepped for tile.  After another day’s work, it was my turn to step in to install the tile.

Here’s a peak of how the finished cement board looks upon installation with the new shower pan…

It’s ready for me to tile!

Installing the tile for a master bathroom renovation, JENNA BURGER DESIGN

More details of the master bathroom renovation coming soon.

I gotta get back to tiling…

Oh, and I’m still deciding on the accent tile.  Any suggestions?  What do you like best??

Accent Tile Options

DISCLAIMER: THIS BATHROOM RENOVATION IS A COLLABORATION WITH LOWE’S. ALL OPINIONS + SELECTIONS ARE MY OWN.

Bathroom Makeover: Reveal

The day is finally here… reveal day of the Bathroom MakeoverThe project that I challenged myself to do in 30 days.  Keeping reading (till the end) to see if I accomplished the goal…

The finished space has taken a wee bit longer than planned to share, but with the holiday high, I got a bit sidetracked.  Good news, Good news… the bathroom is done and has been for a few weeks.  I was planning on sharing the reveal sooner, but thought it would be best to wait till after the Christmas craze.

Without further ado, here it is…

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

As always, I love partnering with Lowe’s on projects and this bathroom makeover wasn’t any different.  I have worked with Lowe’s on so many projects over the years and not only am I thrilled to be apart of their Creative Team, but I truly love their product line.  Minus a few elements, this entire space was pretty much created using in-stock items that can be found in most of their stores.  How great is it not to have to order and wait 8 weeks for something to arrive?!  Grab & go today – that’s a bonus in my book. (I wasn’t paid to say any of that and am sharing my true, honest thoughts!)

Before sharing more of the ‘after’, I have to state that bathrooms – in my opinion – are so difficult to photograph because of the limited size of the space.  I’m not a pro photog, so I tried capturing it the best I could.  That being said, let’s get to it.

You can’t appreciate the after, without seeing the before.  This bathroom has had quite the evolution.  It was pretty sad when we moved in…

Before Bathroom

Within a year, it was painted & got a little refresh…

Before Bathroom

Since it’s heavily used by 2 young kiddos it got + gets quite the abuse on a daily basis.  After a while, the exposed walls (sheetrock) + the builder-grade melamine cabinet  just wasn’t fitting the bill anymore.

If you missed following along from the beginning, this was the mood board I created for the new space…

Bathroom Makeover Mood Board / Plan of Direction for space

A few changes had to be made along the way, but the main elements & more so, the main aesthetic / feel of the space, was absolutely achieved.

My goal was to create an updated, modern bathroom with a classic (live-a-long-time) background + lots of eye-popping, unexpected layers.  I am thrilled with the result not only because it’s super functional for the kids (with tile going half way up the walls), but it’s really a dynamic + fun space!

Come on in…

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Many have asked, “why did you choose to do the kids bath instead of the Master?”, and the reason for that is I see this bathroom much more throughout the day (plus it seemed more of a manageable DIY project because it’s a smaller space).

This bathroom is right at the top of the stairs and since I am up & down a lot on a daily basis, I wanted it to look & feel new, updated, and fresh.  I’ll get to the Master bath someday.  Even though it was featured in a national magazine, it does need some fixin’ up!

This is what I see each & every time I walk up the stairs…

snapshot from my phone The hallway entry into the remodeled bathroom space...

Let’s explore the new bath space more…

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

The space is a typical standard 5′ x 8′ bathroom with a sink, toilet, tub layout on one wall & then a straight wall on the other side.

I installed 3×6 subway tile from the tub deck to the ceiling in the tub space and continued the tile about 3′ up the wall in the main part of the bathroom.  Above the tile, I installed a dynamic wallpaper in a beautiful damask pattern with colors of navy, beige, and orange.  It really is the art of the space so I didn’t add much more to the walls.

On the left side, above the towel bar, I hung two framed custom art pieces (created by my 2 older kiddos) which I will be sharing more details on soon.  The frames + matting are white & simple, the perfect contrast to the bold background.

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

tutorial for >>> how to install wallpaper

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

As you continue around the revamped bathroom,  you round the corner to the tub space.  This area is drastically different with new floor to ceiling tile (all installed by me – thank goodness my hands aren’t cracked anymore).

3×6 subway tile was used as the main tile material, which frames an accent tile of natural stone in a small herringbone pattern

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

3 x 6 subway tile with herringbone accent tile in carrera

tutorial for >>> how to install tile + grout

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Where the wall meets the ceiling, I added a small decorative moulding, which really gave the space a finished, tailored look.  I am not very good with moulding (remember my troubles in the powder room), so this time I chose a moulding that had a 90 degree angle and it was much more manageable + easy to install since the cut was a simple 45.

Adding the moulding not only provides a finished look, but it allowed the install of the wallpaper to be easier – the wallpaper didn’t have to be perfect at the top because the moulding covered it.  Additionally, the moulding continues in the tub area where I was left with a 1/2″ gap between the last tile and the ceiling – a space too small to install tile.

Here I am installing it…

Installing Moulding in the Bathroom

On the other side of the bathroom were more big changes…  a new toilet, vanity, lighting + a new shelf and medicine cabinet turned tiled niche.

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

The shelf is a simple DIY project that I will share more about soon.  The original thought / plan was to add an industrial-style shelf above the toilet, but after the wallpaper went up, I just couldn’t bring myself to cover it + with the new vanity there was ample storage.

A simple white shelf along with a few layered accessories and a framed print seemed to be the perfect addition.

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.comTo the vanity…

The vanity is a beauty and I love the openness it brings to the space.  This vanity compared to the previous one is about 6″ longer.  There was enough room at the side of the toilet to go a bit wider and the additional inches really makes a difference.  Even though it’s minimal, there seems to be a lot more countertop space.

Also having drawers with this vanity, the amount of storage has tripled versus having 1 large open cavity with the last cabinet.  There looks to be 5 drawers, but the center drawer under the sink is a faux panel.  The 2 smaller side drawers + the 2 larger drawers provide so much room.  As the kids get older & accumulate more stuff, I am sure the drawers will definitely fill up.  For now, they’re fairly unused.

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Underneath the closed part of the cabinet is an open shelf perfect for towels, baskets, etc.  I chose these cute burlap bins at Lowe’s and revamped them a bit (of course, how could I not…?)

I loved the texture of the burlap, but the rope pull was slightly too nautical, so I swapped them out for a chalkboard label that I found in the dollar bin at Target.  Using jute rope, I attached them through the holes and in 30 seconds gave these pretty bins a whole new look…

I love how easy & simple something like this can change a space & be unique to your personal aesthetic + style.

Make it your own by changing up a store-bought item.  From rope pulls to chalkboard labels, this DIY upgrade was less than a $1.

Back up above, the countertop is adorned with a few simple, but must-need items.  I found these really cute accessories – liquid soap holder, toothbrush holder, and cup – that were super inexpensive at Lowe’s.  They are clear (plastic), but look very modern and $$$.  The look of lucite is hot right now.

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

I chose a minimalist-style, frameless, rectangular tilt mirror and an industrial-style oversized outdoor light that is centered above (because of the longer vanity, the light had to move over a few inches – my contractor did that since it’s above & beyond my skillset).

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

On the wall to the right of the vanity was a medicine cabinet (which I had painted with chalkpaint + added a frame a few years ago) and is now an open tiled niche

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

A niche is really so much easier for the kids and tiling it makes cleanup so simple.  I was originally going to create the niche using wood and that would have been a big mistake. wood + water = disaster.

DIY: A tiled niche in place of a medicine cabinet.

tutorial for >>> creating a tiled niche

DIY: A tiled niche in place of a medicine cabinet.

before &after DIY: A tiled niche in place of a medicine cabinet.

A few more detail shots…

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.com

And of course a look at a few before & afters…

BEFORE & AFTER Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.comBEFORE & AFTER Bathroom Makover with 95% of the space being a DIY project - new tub + tile, vanity, wallpaper, and more!  Lots of details on this multi-post before & after.  Bathroom makeover by Jenna Burger Design www.jennaburger.comI will admit, I am so happy this bathroom is done.  It was a bit tiring, but in all honesty, it was 100% worth the blood + sweat + tears the effort!  This post was chock full of info on the final stages + reveal of the space, but you really might be wanting where I got it all & the actual resources.  No worries… that post will be coming up later this week – pinky promise.

In all, from start to finish, this bathroom makeover took just around 30 days to complete (95% DIY and mostly all by myself – the mister helped when he could).  So I guess I can say, I met my challenge… which I really only set for myself so I would finish it 100% and not slack off.   10 days, 30 days, 60 days, who cares.  It’s done!  This makeover was a big accomplishment for me as tackling the removal & install of a tub + such a HUGE tile project was nothing that I had done before.  The challenge scared me, but I did it! That’s the beauty of DIY!

From start to finish, these are all the posts pertaining to this bathroom remodel
Plan of Action
Demo: Removal + Installation of the Tub & Walls
How-To Tile + Grout the Bathroom Walls
Installing Wallpaper
Adding a Tile Accent Border
Creating a Tiled Niche
Bathroom Makeover Reveal
Resources

Lastly, I want to give a big shout out to Lowe’s for believing in my talents & choicing to partner with me on this project. They never tell me what to do, what to buy, or what to write, but instead they always say do what you do best… create something good & inspire!

Thanks for following along with me on this bathroom makeover journey!  Cheers to another successful (but tiring) before & after makeover!

Resources for all the items in this bathroom makeover coming later this week.

Bathroom Makeover: Tiled Niche {Day 19 + 20}

The last few weeks have been a whirlwind with decking the halls and preparing for the Christmas season, resulting in the bathroom makeover being put on the backburner.  BUT, progress is still being made and it is almost complete – YAY!

I can officially say, the walls are complete.  Last I shared, I had finished the install of the wallpaper & the tile accent border.  It’s Day 19 & 20 of this Bathroom Makeover in 30 Days Challenge and it’s focused on creating a tiled niche near the vanity.  Here is the result…

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

Before this niche was created, there was a medicine cabinet in this space. This is how it looked when we moved into our home about 5 years ago…

before bathroom makeover

Then about 3 years ago when I gave this bathroom a refresh, I painted the glass of the medicine cabinet with chalkboard paint and added a frame…

before bathroom makeover with chalkboard medicine cabinet

While creating the plan of action for this bathroom makeover, I had the idea of removing the medicine cabinet to create a niche – the perfect small storage solution.   Since I already had the natural stone herringbone tile planned for the shower, I thought the niche would be another ideal spot for it.   Unexpected & a great tie-in.

During the demo phase of the bathroom, I removed the medicine cabinet from the wall by unscrewing a few screws.  It was much easier than I thought it’d be.  In the end I was left with a sheetrocked cavity.

Removing the medicine cabinet

I wasn’t expecting “the hole” to be sheetrocked and was originally planning on needing to create a box to fit in the hole.  Upon removing the cabinet and discovering this, I was pleasantly surprised.  I was able to install the tile directly on the sheetrock that was already in place.

To create the tiled storage niche, I used the beautiful 13″ x 13″ natural stone herringbone mosaic and the 3 x 6 white subway tile that I found at Lowe’s.

White subway tile - the most classic, most beautiful (an one of the least expensive) tile you can get!

Lowes Herringbone Carrera Marble

1. To start, I created a template of the back surface of the niche using craft paper.  Then I layed it on the herringbone tile and traced the outline using a marker.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

2. Then using the wet saw, the Mister (gotta give him creditwink, wink) cut along the line.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

3. Then I layed the tile inside the niche to make sure it was the right size (it wasn’t perfect, but I knew the grout would “hide” any imperfections).  It fit – yay – so using adhesive (the same method I used to install the wall tile), I added the herringbone accent tile to the back surface of the niche.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

4. When the back was finished, I cut and added 3 x 6 subway tiles (same tile as shower) on the sides, top, and bottom.

As I was working from bottom to top on the sides, I cut and added (2) shelves (marble slabs typically used for a door threshold) at varying heights.  The Mister cut it to the right length using the wet saw and we made sure it was long enough so it fit between + sits on the subway tiles.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

5. Once the tiles were in place, I grouted all the joints using the same method as the wall tile.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

6. After the joints were filled and the tile was cleaned off, I added trim around the edges using a 3/4″ decorative moulding.  It was basically like creating a picture frame surround. I cut all the pieces using the miter saw and nailed them in place with finishing nails.  To give an extra tap in place I also used a nail punch to drive home the nails – love that tool.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

7. Then I filled in all the holes using wood filler.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

After the last piece was put in place, I gave the moulding a light sanding, and painted it with semi-gloss white.  Here’s the result…

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

A closeup…

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

This new niche is such a fun, unexpected addition to the bathroom.  Pretty + Functional = A great storage solution

Here is the niche filled with a few things…

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

And a glimpse a few steps back…

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

Bathroom Makeover: a tutorial on how to create a tiled niche + many more DIY projects.

A few more details to go and I will be able to call this bathroom makeover DONE!  Adding a tiled niche on Day 19 + 20 is complete!  Up next… adding details – moulding, lighting, and accessories.  More to come soon!

The installation of the tiled niche took 2 days, about 4 hours each day

From start to finish, these are all the posts pertaining to this bathroom remodel
Plan of Action
Demo: Removal + Installation of the Tub & Walls
How-To Tile + Grout the Bathroom Walls
Installing Wallpaper
Adding a Tile Accent Border
Creating a Tiled Niche
Bathroom Makeover Reveal
Resources

{Day 19+20} Tiled Niche – Complete!  10 more days to go…

Lowes Creative Ideas Team Member

To gather even more unique, fun, and creative ideas for your indoor and outdoor Winter spaces, I would definitely suggest downloading the Lowe’s Creative Ideas app on your iphone and/or ipad.  I’m always checking out the FREE app for great seasonal + do-it-yourself inspiration.

Disclosure: I am part of the Lowe’s Creative Team and was provided with a Lowe’s gift card to purchase items for my project.  I was also compensated for my time to use the products.  No one told me what to create, what to buy, how to use the product, or what to write.  All opinions are 100% mine!

Bathroom Makeover: Installing Wallpaper {Day 17}

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

If you follow along with me on Instagram, then you may have seen a few sneak peeks of the next phase of the Bathroom Remodel… the WALLPAPER!  Tile is done (well mostly) and after 17 days of cutting, grouting, tiling, I never want to touch another tile again in my life.  Now we know that’s not true.  But in all honesty, it was a big job.  Totally doable for any skill level, but just time consuming!

As I move forward with this Bathroom Makeover in 30 Days Challenge, the walls are now adorned with pure beautiful.

Take a look…

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

Can we say dynamic?!  What do you think??

The evolution of this bathroom has been quite interesting.  Every moment I think I am leaning one direction, I end up going the opposite way.  Such as life, I guess.  Originally my plan was to go basic and neutral for the base elements, and then add pops of color and interest with layers.  Before tiling, I painted over the previous yellow paint color with a neutral greige. Once the white tile went up, it felt boring.  It wasn’t a reflection of my design style or the home we’ve created.  It needed something…  Then I found the wallpaper.

This wallpaper by Serena and Lily gave the perfect amount of eye-catching intrigue without overwhelming the space.  There is still a lot of whites + neutrals, and with the other elements I have planned, it’s going to be my next favorite space.

So on to the install…

I’ve wallpapered areas in my home before including the powder room and my son’s bedroom.  Both were one wall projects and didn’t involve a lot of cutting.  When working with a tight space that has lots of nooks, crannies, and crevices, it can get a bit tricky.

Differently from the other walls I’ve used wallpaper on, I never before used a wallpaper paste.  A discussion started a few weeks back on a picture I shared on Instagram about using wallpaper primer.  An expert chimed in strongly suggesting using wallpaper primer before wallpapering, ” You can install wallpaper without primer if you have smooth walls, however, it’s going to be a pain later when when you want to remove it. If you prime your walls, the wallpaper will roll down in long flowing strips. If you don’t prime, the drywall comes off with the wallpaper in 6+ years.”  My thought upon this input… USE WALLPAPER PRIMER.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

I chose this clear wallpaper primer at Lowe’s and the gallon was about $16.  I used the smallest amount so a little goes a long way.  I wish they sold it in smaller amounts, but o well.

I poured the primer into a paint tray and using a roller, I  applied it to the walls.  You really only need a thin coat because it is watery.  I found after a few minutes some of the primer dripping down the wall, so I took a cloth and dabbed it so it wouldn’t harden.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

In about 3 hours, it was dry and ready to wallpaper.  I waited till the next morning to start though…

Supplies for Wallpapering

  • Wallpaper
  • Wallpaper Paste
  • Smoothing Tool
  • Sharp Razor or blade
  • Other handy tools for wallpapering are: a tape measure, a laser level, a pencil

How-To Wallpaper

I started off at one edge of the wall and worked my way around the room from that point. Because I am planning on adding moulding at the top of the wall, and a tile trim piece at the bottom, measuring exactly wasn’t needed – phew!  I measured about the length of the wall and cut my wallpaper with a scissor. Then I layed it on the floor so I could apply the paste.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

Unlike with my previous wallpaper experiences, this time I applied the wallpaper paste to the back of the wallpaper as indicated on the instructions that came with the wallpaper.  In the past, I put the paste directly on the wall, then adhered the paper.  I wanted to see if this other method worked better (and in the end, it did!).  Why?  I felt that by adding the paste to the back of the wallpaper instead of applying the paste to the wall there resulted in less air bubbles and air pockets.  The paper was easier to smooth out which avoided the paper from getting creased or damaged.

I applied a nice coating of wallpaper paste using an inexpensive paint brush.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

2

Then I let the paper sit about 3 minutes (as the instructions stated) and aligned it on the wall.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

Once I positioned it where I thought it look best, I used a long level (sorry no picture) and made sure it was vertically plumb.  Once I had the paper in the right place, I used the smoothing tool to smooth out the paper from air bubbles and air pockets. It’s best to start in the center of the paper and work your way out to the edges.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

Once the paper was smooth, it was time to move on to the next piece.  I cut another piece of wallpaper length and then aligned it edge to edge with the previous piece.  Never overlap the wallpaper.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

Once it was smoothed out, I took a lint-free rag and cleaned off the paste from the seams. One reason that I love this paper is that is easily cleanable.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

This damask looking wallpaper was really nice to work with and the quality was very good, but I was slightly unhappy with the design repeat when I went to align the edges. The design didn’t match exactly like it should and I was bummed about it.  I tried my best to line up the design to make it look right.  Thankfully the pattern is so busy that you don’t really notice.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

Once I had the 2 sheets up, I was feeling really confident in my work.  I continued around the room and then I came to my first obstacle…  the corner and the door.

For this area, I used the old method of applying the paste to the wall because I was afraid if I didn’t, the paste would get on everything – door, tile, etc.   To start, I measured and trimmed the paper leaving lots of extra on the edges. Then I put it in place and trimmed again until the size of the paper fit the exact space.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

I had a few other obstacles to overcome like the outlets, the switches, and the light.  I typically use a scissor or a sharp blade to cut the paper.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

Before I knew it, a few hours later, all the walls were covered and the wallpapering process was complete.

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

A recap of the before & in-progress now.

Bathroom Remodel: before & progress / Check out this DIY bathroom makeover

Whats up next?

The moulding at the top + the tile trim around the shower & walls…

Bathroom Remodel: DIY bathroom makeover in 30 days. This phase of the project is installing wallpaper. Check out the details + the before & after NOW

As you can see, this new bathroom space is surely NOT going to be boring.  I can’t wait to finish it up and finally use it.  Even though there are lots of little things still to do, I am thrilled with the direction that it is taking.

The installation of this dynamic wallpaper took about 5 hours on one day

Follow along on this bathroom remodel with these other posts
Plan of Action {Day 1}
Demo: Removal + Installation of the Tub & Walls {Day 2-4}
How-To Tile + Grout the Bathroom Walls {Day 5-16}
Installing Wallpaper {Day 17}
Adding a Tile Accent Border {Day 18}
Creating a Tiled Niche {Day 19 + 20}

Coming up (still to do)
Details: Moulding, Lighting, Accessories
Finishing Touches
Bathroom Remodel Reveal

{Day 17} Wallpaper – Complete!  13 more days to go…

This post is sponsored by Lowe’s, but all thoughts and opinions are 100% my own.  I am thrilled (and a bit nervous) about tackling this project, but very excited to be partnering with Lowe’s on creating an entirely new bathroom space.  I’d love for you to follow along on this new project!

Check out more of my posts on wallpapering

[Frames Wallpaper in my son’s bedroom]How To Wallpaper: tips + tricks to wallpaper like a pro!

[Amy Butler Wallpaper in my Powder Room]How-To Hang Wallpaper with paste